MOD-03Maintenance scheduling

Plan around condition, not around the calendar.

Fixed intervals over-service the machines that barely run and under-service the ones carrying three shifts. Scheduling here blends your routine preventive plan with condition-triggered jobs, and fits both into the stops you were already taking.

Week 14 - Line 2Planned 5 h 10 m
Sat 06:00Condition triggered

Replace CD-04 drive bearing

Sat 07:40Routine

PM: belt tension, Line 2

Fri 14:00Condition triggered

Calibrate IM-06 zone 3

Tue 09:00Routine

PM: compressor filter check

Both condition jobs ride along with stops already on the plan.

Condition-triggered jobs appear next to your routine PM plan

Work is fitted to planned stops and shift availability

Each job carries its parts, duration and the alert that caused it

In the product

One calendar, three kinds of work.

Routine preventive maintenance, condition-triggered inspections and critical repairs sit on the same week view, so the plan reflects what the plant will actually do.

Maintenance calendarWeek 14

Mon

PM: lubrication round, Line 2

45 m

Tue

PM: compressor filter check

30 m

Inspect PU-05 seal weep

20 m

Wed

No planned work

Thu

PM: press ram inspection

60 m

Fri

Calibrate IM-06 zone 3

40 m

Sat

Replace CD-04 drive bearing

90 m

PM: belt tension, Line 2

25 m

Sun

No planned work

Routine PM Condition triggered Critical repair

Capabilities

What this module handles.

Condition triggers

A high or critical alert proposes a job with the right trade, duration estimate and parts already attached.

Planned stop awareness

Jobs are steered toward windows you already lose to changeovers, cleaning or weekend stops.

Job checklists

Each task type carries its own steps, torque values, safety isolations and sign-off points.

Trade and crew load

See how many electrician or fitter hours a week is carrying before committing to another job.

Route-based PMs

Lubrication and inspection rounds are grouped by physical route so a technician walks the line once.

Completion record

Time taken, parts consumed, findings and photographs are written back to the asset history.

Setup

From first login to first useful result.

  1. 01

    Bring in the PM plan

    Load your existing preventive tasks with their intervals and trades. Nothing is discarded.

  2. 02

    Define planned stop windows

    Tell the scheduler when the line is normally down so condition jobs get slotted there first.

  3. 03

    Set crew availability

    Enter trades and hours per shift so the week view shows a plan that can actually be staffed.

  4. 04

    Work the queue

    Technicians open the day's list on a tablet, complete the checklist and the asset record updates itself.

Questions

Asked on the floor.

Does fixed-interval maintenance disappear?+

No. Statutory inspections and manufacturer-mandated intervals stay on fixed schedules. Condition-based scheduling applies to the discretionary work around them.

What if a job cannot be done in the proposed window?+

Push it and record why. Deferred critical jobs stay visible with their risk window so the decision is deliberate rather than forgotten.

Can technicians work offline?+

Job lists and checklists are cached on the device, and completions sync when the tablet reconnects. Plant floors with poor coverage are the normal case, not the exception.

How are repeat jobs handled?+

If the same fault reappears on an asset within a short window, it is linked to the earlier job so the pattern surfaces instead of being logged as a new incident.

Downtime risk ticket

Put a number on the next breakdown.

96
M1
91
M2
79
M3
93
M4
94
M5
89
M6
Ticket: EstimateType: Unplanned downtimeStatus: Draft
40assets
5500
24h / month
2200
25,000INR
2,0005,00,000

This is an illustrative estimate based on typical patterns, not a live analysis of your equipment. It assumes a 20-35% reduction in unplanned downtime. Connect your maintenance logs for your actual numbers.

Hours you could win back

58-101h / yr

Downtime today
288 h / yr
Per machine
7.2 h / yr
Value at stake
INR 14.5 L-25.3 L