Skip to content
Indussbz
VIEW-BThe maintenance team view

Start the shift knowing what to fix first.

Reactive maintenance means the machine decides your day. The shift list here is ranked by risk, each job already shows whether the part is on the shelf, and the checklist travels with you on a tablet instead of on a clipboard that never comes back.

Shift queue - Day A4 open jobs
  • CD-04Replace drive bearing

    Critical alert, 87% confidence

    In stock after reorder

    90 m
  • AC-03Change air filter element

    High alert, restriction rising

    9 on hand

    30 m
  • PU-05Inspect seal weep

    Watch item, 61%

    2 on hand, at minimum

    20 m
  • LINE2Lubrication round

    Routine PM, due today

    Not applicable

    45 m

The daily difference

Less firefighting. More finishing.

Before

  • Job list decided by whatever broke overnight
  • Walk to the store, find the part missing, walk back
  • Same fault on the same machine every few months
  • Paper job cards that never reach the asset history

With Indussbz

  • Queue ranked by risk and criticality before the shift starts
  • Part availability shown on the job, reserved when flagged
  • Repeat faults linked so the root cause becomes obvious
  • Completion recorded on the device, written to the asset record

On the floor

Designed for gloves, noise and poor signal.

Screens a technician uses standing next to a running machine need large targets, few words and no dependency on a stable connection.

Risk-ranked queue

Jobs ordered by alert severity, asset criticality and how long a deferral has been running.

Part shown on the job

On-hand quantity, bin location and reservation status appear before you walk to the store.

Checklists with sign-off

Isolation steps, torque values and inspection points recorded as you go, with photographs where useful.

Works offline

Lists and checklists cache on the device and sync when the tablet finds the network again.

Asset history in hand

The last three interventions on that machine, including what was replaced and by whom.

Honest time estimates

Durations are built from your own completion times, so the plan reflects how long jobs really take.

The technician's call still counts

The platform suggests. You decide.

An alert is evidence, not an instruction. Confirm it, reject it, or record what you actually found - and that outcome feeds back into how the pattern is weighted next time.

  • Reject an alert with a reason and it stops repeating
  • Record the real fault when it differs from the prediction
  • Add findings that no sensor would catch, in your own words
  • Defer a job with a note so the decision is visible, not hidden
Job close-out - JOB-2291CD-04 drive bearing
Alert outcome
Confirmed
Found
Drive-end bearing, outer race pitting
Parts consumed
BRG-6205-2RS x 1
Time taken
80 m against 90 m planned
Downtime class
Planned stop

Technician note: coupling alignment also out by a small margin, corrected. Recommend checking the same on CD-07.

Written to asset history and MTBF recalculated

Downtime risk ticket

Put a number on the next breakdown.

96
M1
91
M2
79
M3
93
M4
94
M5
89
M6
Ticket: EstimateType: Unplanned downtimeStatus: Draft
40assets
5500
24h / month
2200
25,000INR
2,0005,00,000

This is an illustrative estimate based on typical patterns, not a live analysis of your equipment. It assumes a 20-35% reduction in unplanned downtime. Connect your maintenance logs for your actual numbers.

Hours you could win back

58-101h / yr

Downtime today
288 h / yr
Per machine
7.2 h / yr
Value at stake
INR 14.5 L-25.3 L