Skip to content
Indussbz
MOD-01Predictive maintenance alerts

The alert that arrives while the machine is still running.

Every asset carries a live health score built from the data your team already records. When readings drift away from an asset's own baseline in a shape the engine recognises, an alert is raised with a confidence level and a likely window - not a vague warning.

Alert ALR-1184CD-04 Conveyor drive

Detected pattern

Bearing wear, drive end

Critical

Confidence

87%

Window

9-14 d

Score

38

Evidence

  • - Vibration complaints logged on 4 of last 6 shifts
  • - Motor current 11% above the 30-day baseline
  • - Interval between drive-end repairs shortening
  • - Runtime 1,840 h since last bearing change
Recommended action: replace bearing at next planned stop. Part BRG-6205-2RS flagged.

Every alert states its confidence level and the evidence behind it

Scores are compared to each asset's own baseline, not a generic average

No alert fires without a named action and the part it will consume

In the product

Score bands decide what happens next.

Health scores are not decoration. Each band maps to a specific response, so technicians know whether to watch, plan or act.

Healthy85 - 100

Readings inside baseline. Routine PMs only.

Watch60 - 84

A trend is forming. Logged, not yet actionable.

High40 - 59

Pattern matched. Part flagged, job proposed.

Critical0 - 39

Failure likely inside the stated window.

Alert queueLine 2, this week
  • CD-04

    Bearing wear, drive end

    87%

    Critical

  • AC-03

    Air filter restriction rising

    74%

    High

  • PU-05

    Seal weep pattern forming

    61%

    Watch

  • IM-06

    Heater band drift on zone 3

    58%

    Watch

  • HP-02

    No pattern detected

    -

    Healthy

Capabilities

What this module handles.

Per-asset baselines

A press that runs three shifts is measured against its own history, not against a plant average that flatters it.

Pattern library

Bearing wear, seal degradation, filter restriction, belt slip, lubrication loss and heater drift are each matched by their own signature.

Stated confidence

Alerts carry a percentage and a time window. Low-confidence findings are logged as watch items, not escalated as emergencies.

Repair-interval analysis

Shortening gaps between repairs on the same component are treated as a signal in their own right.

Routing by severity

Watch items stay in the queue. High and critical alerts notify the named owner for that asset group.

Feedback loop

Technicians mark each alert as confirmed, partly right or false. Those outcomes tune detection for your plant.

Setup

From first login to first useful result.

  1. 01

    Load the asset register

    Import or enter your machines with tag numbers, line, criticality and install date. A spreadsheet is enough.

  2. 02

    Backfill repair history

    Even twelve months of past breakdowns and parts replaced sharpens the first scores considerably.

  3. 03

    Log readings on rounds

    Operators record runtime, meter values and any symptoms on a tablet or phone during normal rounds.

  4. 04

    Review the first alerts

    Expect watch items first. Confirm or reject them so the engine learns which patterns matter on your floor.

Questions

Asked on the floor.

Do we need vibration sensors to start?+

No. Scoring begins with runtime hours, operator symptom reports, meter readings taken on rounds and repair history. Sensor feeds can be imported later to sharpen specific assets.

What happens when an alert turns out to be wrong?+

Mark it rejected with a short reason. The engine weights that pattern lower for that asset class, and the record stays visible so nobody re-litigates the same call twice.

How is confidence calculated?+

It reflects how closely current readings match a known pattern and how much history exists for that asset. Thin history produces lower confidence, and the alert says so rather than hiding it.

Can an asset be excluded from alerting?+

Yes. Low-criticality assets can be set to monitor-only, so they still carry a score but never raise notifications.

Downtime risk ticket

Put a number on the next breakdown.

96
M1
91
M2
79
M3
93
M4
94
M5
89
M6
Ticket: EstimateType: Unplanned downtimeStatus: Draft
40assets
5500
24h / month
2200
25,000INR
2,0005,00,000

This is an illustrative estimate based on typical patterns, not a live analysis of your equipment. It assumes a 20-35% reduction in unplanned downtime. Connect your maintenance logs for your actual numbers.

Hours you could win back

58-101h / yr

Downtime today
288 h / yr
Per machine
7.2 h / yr
Value at stake
INR 14.5 L-25.3 L